Southworth Steam Pump- first parts

by John

A couple of days in the workshop, and the large castings are almost fully machined.  Straightforward machining.   Made a couple of mistakes, but none fatal.  Changing BA fasteners to metric.

P1032887.JPG

The steam cylinders block in the mill vise.   Almost complete water cylinders block sitting behind for the photo.

P1032888.JPG

Steam cylinders on right, water cylinders on left.  The temporary steel pins are to ensure accurate alignment of the 2 blocks.   Water and steam passages come later. 

This is the first model machining which I have done since April.  It should be second nature, but I admit to a bit of hesitation, nervousness, initially.  Especially starting on an irregular, slightly complicated shape like these.   But it is all coming back now.  And I am really enjoying it.