6″ Vertical Boiler. Finishing the firedoor
by John
The doors on this boiler have consumed more time and energy than I expected.
Partly because the firedoor has a vent, has a heat shield, is oval shaped, and is mounted on a curved surface which will get very hot in use.

It is still not quite finished, needing a catch and a latch. There is a spring which pushes the vent against the door. And a heat shield which needed a few shaping processes to make sure that it did not foul the firehole. The heatshield is supposed to be stainless steel, but the copper cutout left over from when the firehole was cut in the wrapper, seemed ideal for the job. The central shaft is stainless steel, threaded M4 at back and M3 through the door.

I intend to use propane as the main fuel for the boiler, but I have constructed the firebox so it could use coal as an alternative. This is the ash pan opening. Constructed from 1.4mm brass, and silver soldering the join. Pretty neat hey! I have made the door and hinges, and will hang the door next session. I will replace those cap screws with something more suitable.

The hinges are quite small. 3mm wide, and when trimmed will be about 18mm long. To make them I drilled a 1.5mm hole in a piece of brass rod, silver soldered the rod to some 1.3mm sheet brass, then bandsawed- cut the piece into separate hinges. Since that pic was taken I have milled the width to 3mm, and trimmed the lengths. I dropped one hinge, and spent a fruitless hour trying to find it. Fortunately I had made a spare, but I cannot aford to lose another. The hinges will be riveted to the door and the ashpan surround.
Hi John,
I look forward to every update and I can assure you that I feel your pain and frustration with the breaking endmills 😀
May I ask you where you got the plans for the boiler? Or is this more of a homegrown effort?
I am in the finishing stages of building a “Minator Ironclad” engine and I’m looking for a suitable boiler.
Hence the”homegrown” question.
Rgds
Graham
LikeLike
Hi Graham, my 6″ vertical boler is based on plans for a 5″ boiler which was originally published in Model Engineer in 1985. I modified the plans to suit my 6″ copper tubing. If you send me an email address I can forward the plans. John
LikeLike