Southworth Steam Boiler Feed Pump Progress.

by John

With book reviews and OP’s workshops on this blog you might be wondering if anything is happening in MY workshop.

Well, yes.

I have been beavering away, making parts for the Southworth steam powered boiler water feed pump.  Today I made the final parts.  The machining has been fairly basic and straightforward, so no special photos or videos.

IMG_8196.JPG

These are the parts and assemblies.  Top is the steam cylinders left, the water cylinders right.  The water pump stack not attached.  The the tails for the valve rods, the valve rods with valves attached, the cylinder caps, the valve rod levers, and some of the gaskets.

I will make a separate blog about the gaskets.  These were all laser cut.  I will never hand cut another gasket.  Laser cutting is cheap, fast and accurate.  Way to go!

IMG_8197.JPG

The valve levers and fittings.   These are small, precise, and accurate.  Quite a pain to make, even with CNC.  I remade more than one of these, due to dropping and losing the original.  The fasteners are M2, and not finalised.  The off centre drilling of the left hand fitting is of no consequence (I hope).

IMG_8198.JPG

The valve rods, M2.5, and valves.  Cutting those threads, 2.5mm diameter and 25mm long, was also a challenge.  I learnt about fixed steadies, but too late to use on this job.  Subject for a future blog.

IMG_8199.JPG

And some of the cylinder end caps.  There are 8 altogether.

So now that all of the parts/components are made, I will commence the assembly, then the timing of the steam engine component.  Watch this space.

Book review of “A Military History of China” coming up soon.  Quite an eye opener.

If you have not sent in photos of your workspace, please do so.  The series has generated quite a lot of interest.