Hydrostatic Trevithick Boiler Test

by John

This is a video showing how I performed the hydrostatic test on the boiler.

The engine is currently being made, but not at the time of the video.

The test is to hold water at double the working pressure of the boiler, for 20-30 minutes, checking for bulging or distortion of any of the components, and any significant leaks.  Any leaks would need to be fixed, but for the boiler certification, as long as the pressure can be maintained for the duration of test, that is OK.

The working pressure of this boiler will be 50psi, but the minimum pressure in the AMBSC code is 60psi, so the hydrostatic test will be done at 120psi.   As you will see in the video, the pressure reached 140psi at times.

In fact, the AMBSC code is formulated in terms of materials and design to cope with 8 times the working pressure, so the safety margin is generous.

The video is taken over 20 minutes.  I ran the actual test for over an hour.

I am afraid that my very messy bench and workshop are evident in the video.  No apologies.  That is just the way that I work.